EzraNet Building List
Each fiscal year, the EzraNet Program Director proposes the schedule for the next two fiscal years, based on the infrastructure status of the buildings. Academic buildings have priority over administrative buildings and residential halls. The Office of the Provost ultimately decides what the academic priorities are and provides CIT with the final list.
The buildings listed under each fiscal year were initiated in that year. An EzraNet project generally takes 18-24 months from start to finish. If you have questions related to the program planning or want to know what the schedule is for your specific building, please contact the EzraNet Program Director, Sasja Huijts, at smh74@cornell.edu or 607 254-7400.
Buildings in Progress
initiated in FY05:
Clark Hall
Rhodes Hall
initiated in FY06:
Bard/Kimball/Thurston Halls
Vet Medical Center
initiated in FY07:
Vet Research Tower
Vet Education Center/Schurman Complex/Diagnostic Lab
initiated in FY08:
Snee Hall
Riley Robb Hall
Wilson Synchrotron
initiated in FY09:
Bradfield
Emerson
Olin Chemistry Research/Baker Lab
Newman Lab
Ujamaa
Low Rise 6
Low Rise 7
Low Rise 9
George Jameson
High Rise 5
Clara Dickson
Hurlburt
Mary Donlon
Balch
Risley
Completed Buildings
Biotech Building
Comstock Hall
Gannett Health Center
Goldwin Smith Hall
North Campus Low Rise 8
Myron Taylor Hall
Olin Hall
Upson/Grumman Hall
Warren Hall
Willard Straight Hall
Buildings included within the scope* of EzraNet
(Buildings are listed alphabetically, not by order of priority.)
| |
* Buildings that are not included in the scope of EzraNet are new buildings and buildings in which infrastructure was recently upgraded; off-campus buildings (those that currently aren't connected to the university backbone); and buildings with low network usage.